He said now that the stations are operational, gas distribution via IGAT-8 (the 8th national gas trunkline) is being carried out in a more sustainable manner with more room for maneuver.
Safashahr pressure station can pump 90 mcm/d of gas. The project was built with €860,000 and IRR307b, he added.